Make-Ready Turnover Schedule
A coordinated schedule for the work needed to restore a vacant residential unit or commercial suite to move-in-ready condition.
A Make-Ready Turnover Schedule is an operational timeline coordinating maintenance technicians, painting contractors, flooring installers, and cleaning crews to restore a vacant apartment or commercial suite to move-in-ready condition.
Set the target completion date from the inspection and actual scope of work, then coordinate the required work and readiness check.
Frequently Asked Questions
How should a make-ready completion target be set?
Use the inspection and actual scope of work to plan the schedule. Confirm the required work and readiness check rather than assuming a fixed turnaround for every unit.
More in Maintenance
See all Maintenance terms →Asset Register
An asset register records assets and links each identifier to information such as location, condition, and supporting records.
Read definition →Backflow Prevention & Annual Certification
Mechanical cross-connection valves preventing contaminated water from back-siphoning into municipal drinking water, requiring annual testing.
Read definition →Bid Leveling
Bid leveling compares vendor bids on a common scope, assumptions, pricing basis, and documented evaluation criteria.
Read definition →Callback Rate
Callback rate is the percentage of completed service jobs with a qualifying return visit. Define the cohort, callback criteria and follow-up window before comparing results.
Read definition →Computerized Maintenance Management System
A computerized maintenance management system is software for organizing work orders, maintenance schedules, equipment records, and service history.
Read definition →