Predictive Maintenance
Predictive maintenance uses measured equipment condition to identify deterioration and plan work before failure.
Predictive maintenance uses measurements of equipment condition to detect deterioration and determine when maintenance is needed. The aim is to act before the equipment experiences significant degradation or failure.
It differs from preventive maintenance performed solely on a preset calendar or operating-hours schedule. Its decisions rely on condition evidence, such as measurements showing a change in how equipment is functioning.
Source: U.S. Department of Energy: O&M Best Practices Guide, Chapter 5.
Frequently Asked Questions
Is predictive maintenance just another fixed service schedule?
No. Its defining feature is equipment-condition evidence. A preset calendar or operating-hours interval is a preventive approach.
More in Maintenance
See all Maintenance terms →Backflow Prevention & Annual Certification
Mechanical cross-connection valves preventing contaminated water from back-siphoning into municipal drinking water, requiring annual testing.
Read definition →Elevator Modernization & Maintenance Agreement
A specialized service contract governing preventive lubrication, safety inspections, 24/7 entrapment dispatch, and elevator modernization.
Read definition →Emergency Maintenance Response SLA
An agreement defining responsibilities, response targets, and escalation arrangements for urgent maintenance incidents.
Read definition →Fire & Life Safety Testing (NFPA Compliance)
Mandatory recurring inspection and certification of fire alarms, sprinklers, and emergency egress systems per NFPA and municipal safety codes.
Read definition →HVAC Log & Maintenance Standard
A systematic record documenting scheduled filter changes, belt replacements, refrigerant pressures, and technician service to protect mechanical equipment.
Read definition →